Energy-efficient HVAC and plumbing at senior housing project

Energy-Efficient HVAC and Hot Water

Plumbing

Construction Oversight

Davis, California

Project Start: Spring 2004

Project End: Spring 2007

Architect: James Zanetto, Architect and Planner

Owner: Davis Senior Housing Cooperative

Eleanor Roosevelt Circle is an affordable senior housing facility with 59 one-bedroom apartments, a community building, and laundry facilities. The project is a cooperative partnership of Davis Senior Housing Communities, Neighborhood Partners, LLC, and the Yolo County Housing Authority. Designed to provide seniors with convenient access to community services and with energy efficiency in mind, the project was was nominated for the I. Donald Terner Prize for affordable housing projects. Meline Engineering provided the HVAC and plumbing designs for all buildings on the project.

Energy-Efficient HVAC and Hot Water

The HVAC system for individual apartments included an Aqua-Therm system – a tank water heater that generates hot water for space heating and domestic hot water use.

The Community Building HVAC system design featured two-stage cooling and heating for the large dining and meeting area. Two heating/cooling units were linked to a single air distribution system staging. This design provides efficient heating and cooling at part-load conditions, as only one heating or cooling unit needs to be engaged.

The HVAC system design also incorporated a hood for the grill in the community building’s commercial kitchen. This type of hood would usually require the installation of a make-up air unit. The owner and architect were concerned about the first and maintenance costs, as well as the poor aesthetics of such a unit. They asked Meline Engineering to investigate alternatives. Meline Engineering provided calculations satisfying the hood manufacturer and code requirements, which allowed the installation and successful operation of the hood without installation of a make-up air unit.

Plumbing

Plumbing design included all components necessary to provide for a functioning commercial kitchen in a compact space. In addition, Meline Engineering specified the site booster pump for domestic water.

Construction Oversight

Construction administration included responses to RFIs and additional design services to accommodate a new directive to install commercial kitchen equipment during construction.